Skip to main content

Recent Releases — Work Prioritiser: a smarter way to see which job is on fire

Announcement article for the Recent Releases collection — companion to the full how-to article.

Overview

Work Prioritiser is an optional addition to the Workflow board that scores every job and can automatically sort each column so the highest-priority work sits at the top. It's switched off by default and is being turned on gradually, company by company — if you don't see it yet, it hasn't reached your account.

👥 Access permissions

  • Everyone with Workflow access sees job scores once Work Prioritiser is on. Choosing the mode, setting column weights and card colours are Administrator and Power User only. Standard Users see Sort by and Column summaries only.

📍 Location in the app

  • Productivity > Workflow > Settings


How scoring works

Every job gets a score out of 100, blending two things:

  • Urgency — how much time is left before the job's due date, based on your company's Work Schedule, minus the labour still to do.

  • Value — the order total including GST, with a small boost for repeat customers.

Urgency and Value are blended 50/50 by default. Scores fall into three bands: 80 and above is High, 50–79 is Medium, and under 50 is Low.


Modes

  • Off — the board works exactly as it does today; no scores shown.

  • Preview — scores are shown on cards, but nothing is reordered.

  • Live — each column is automatically sorted, highest score first. You'll be asked to confirm before switching a column to Live.

📝 Note

  • In Live mode, you can't drag a job to a different position within the same column — the score decides the order. You can still drag a job into a different column. A board you already had open doesn't re-sort until you reload it.


Reading a job's score

Open a job's score panel to see how its score was worked out, its rank within the column, and when it was last calculated. Standard User (No Pricing), Workflow Only and Productivity users don't see the order total in this panel.

📝 Note

  • Scores update when an order is submitted, moved or re-dated, and whenever weights or the Work Schedule are saved. Ticking off labour only feeds into scoring at the next nightly run, so a score won't change the instant you tick something off.


Customising weights and colours

Administrators and Power Users can set a different Urgency/Value weighting per column, choosing a preset (Balanced, Deadline-focused, Value-focused) or a custom split. Card colours and an optional colour tint by score band can also be set here.


What's not included yet

Work Prioritiser is web-only for now — scores aren't shown in the Factory mobile app yet.

Did this answer your question?